Thursday, July 31, 2008

Shortskirt No Panties

's go!

Just now came the news of our construction manager, Mr Biermann: Tomorrow morning at about 09.00 clock go off to work .... Phew ... now is really exciting and I'm not even nachzuschauen time ....

Sunday, July 27, 2008

Top Les Denise Milani Model

More info about passive houses

Very often when I tell them that we are building a passive house, get comments like "because it allowed for opening the window?" or "How, without heating? you building any event includes the fireplace."
The best was the following comment: "passive house No, I'd not want to live I would always feel cold, so utterly without heating.."

So here are some links to more information about passive houses: http://de.wikipedia.org/wiki/Passivhaus

http://www.ig-passivhaus.de/

http://www.passivhaustagung.de/Passivhaus_D/passivhaus.html
http://www.das-energieportal.de/wohneigentuemer/passivhaus/
http://www.arbeitundklimaschutz.de/ 20_themenbereiche/20a_tmpassivhaus.htm

Who may ask, feel free to contact us.

So now I read once our sampling protocol.
Bernhard

Friday, July 25, 2008

Driver's License Template Wisconsin

A few pictures from our plot.


Here are some pictures from our plot of today. The construction area is cultivated or not at all on our side. On the other hand, already offers some passive houses. It's worth the largest passive house settlement Of Europe. Now it is perhaps the largest open space with a couple of passive houses in Europe. Not bad.

show the red stakes, will stand where our castle. The plane trees, the gravel driveway and parking drumrum Just imagine holding ....

The plot ends with the next house (townhouse). Right ends where the land begins the fence that is visible on the first frame.

next Friday the bulldozers move on .....

Thursday, July 24, 2008

White Lump Came Out Of My Nose

sampling

Sun It's now really begins.
On Monday and Tuesday of this week there was the sampling of our house. We had the internet before it information, which should prepare you can do. On the homepage of our house manufacturer is also a great site diary, where you could see a lot of information.

We had previously read that it was great to set up his house and it makes a lot of fun. However, we are not happy-in-Hardware Stores-walkers. So it was not really fun but rather diligence work. Hopefully, we have taken all the right decisions.

The selection at Schwoerer is actually big enough to stay within the standard. But it comes with the samples still do something. We were the next to the self-selected floor coverings (other than standard tiles and floor) and some other things also things which we have previously made any thoughts like Ortgangverkleidung. This is the lining of the roof beam visible to the weather page. Some of us have the extras put off additional equipment to take.

Some additional services we took yet. For example, Cat 7 cabling.

I'll write another little something for sampling again when I have time.

How Much Isabella Soprano Charge Bunny Ranch



rises.
We are building a passive house Schwoerer. With this includes everything. Heat recovery technology (WGT), solar thermal, photovoltaics, geothermal heat exchanger, passive Solution window, etc.

We pretty much already decided in January to do so. We were, however, have a free right of withdrawal granted to May.
building permit is there.
Now the building shortly before the start. On Monday / Tuesday was sampling.

And I'm going to write a little more what happened.


first I had the blog at www. blog.de at: http://unserschwoererpassivhaus.blog.de/ provided. But that was too complicated. Therefore here now.